PP Velika Gorica

The respective economic structures classically built facility with a total of 4 floors. In the basement there is a storage area, closed garage, gas boiler, on the ground floor, 1st, 2nd, 3rd floor is the office and other space for the needs of the police station. On the ground floor entrance reception area, internal storage and mailbox

DESCRIPTION MECHANLICAL INSTALLATION

For the purpose of heating in the basement is installed gas boiler room with a gas boiler, power of 380 kW. Gas boiler for heating hot water supplying these heating elements:
- radiators - heating facility
- fan coil units - heating facility
- air handling - for the purpose of ventilation facility
For the purpose of cooling the cooling unit installed on the roof of the building. From chiller cooling water is distributed to the following cooling systems:
- fan coil - cooling facility
- air handling - for the purpose of ventilation facility
Gas connection of the entrance facade.
Ventilation facility is done in two ways:
- mechanically through klimamomore
- the natural way, through the window

 

We are at your disposal for any questions